Friday, March 29, 2019

The big reveal

The process of refurbishing our Pilatus PC-12 finished on schedule on March 25, 2019. That is a total of 48 calendar days or just under seven weeks.  I picked the plane up on March 26 at Hill Aero in  Lincoln, NE.  An instructor from FlightSafety met me there in order to take the right seat on the flight back to Austin. The FlightSafety instructors get a lot of time in the sim, but not much in the real airplane so I have volunteered to take them along on certain flights where it makes sense. It was also nice to have a second pilot onboard after having not flown the plane for almost seven weeks (although I did do a knock-the-rust-off session in the FlightSafety a few days prior to picking up the plane).

Once we arrived at Hill Aero, they had the plane in their main hangar ready to go. It was beautiful inside and out. We did a super thorough pre-flight inspection that took more than an hour. We were especially careful to check all the flight controls which had been removed, painted, and then reinstalled. Checking the elevator which is about 15 feet off the ground required the use of an electric lift platform.

Checking out the elevator...




Despite going over the plane with a fine tooth comb, we found essentially no defects. The folks at Hill Aero did an outstanding job of quality control.

First look at the new interior...


After thoroughly checking the plane, it was time to pull it out of the hangar for some "glam" photos. Hill Aero did of these shots as you can see from their logo.



They made a lot of photos of the interior...









I made a fairly long video (~20 minutes) a few days after picking up the plane explaining some of the details of the refurbishment process and the decisions an owner needs to make contemplating such a process. Probably a lot more detail than most people would be interested in, but here is the video just in case. The audio is poor in places due to the wind noise.

Direct link: https://youtu.be/jwXfAE7lHrc

 

That concludes the story of making N575PC look like new. We are looking forward to enjoying her for many years to come.

Monday, March 25, 2019

Making the sausage: Part 2

In Making the sausage: Part 1, I described some of the process of repainting the exterior of our PC-12 aircraft.  At the same time the exterior work was happening, the interior was removed and completely refinished with new leather, fabric, carpet, and paint.  The interior was was by far the most complicated and costly (about 2x the exterior work) part of the process. This post is mainly photos of that process.

Removal of essentially every piece of the interior -- empty shell inside.


All the interior pieces are cataloged and safely stored.






Once everything was removed and cataloged, the process of removing the old leather and fabric from the hard panel substrate and seats begins.






All the old wood veneer gets removed too.




Not much is painted (mainly cockpit panels, potty interior, and inside of main cabin door), but all painted pieces are removed and sanded too.













Once all the old material removed, the work begins on applying the new coverings.

Applying the new unstained wood veneer.  This is called a "reconstituted composite" veneer.  It is real wood that is processed to give it a more consistent grain. We were told it is easier to repair than natural grain since there is not as much difficulty attaching a new section of veneer to an old one.







Apply new leather to substrate.










The passenger seats are an especially complex task.






The crew seats are refreshed as well.





Not many fabric covered pieces remaining other than the walls of the luggage compartment which get new covering.





The fabric curtains for the luggage area and between the cockpit bulkhead pieces are also replaced.





The wood gets stained before the laborious finishing process starts.




After staining, the wood gets about seven coats of finish. Between each coat the finish is sanded and left to dry ("breath") for a few days to insure no moisture it trapped between layers.  This is the bottleneck in the process timing.






After six weeks, the plane starts to go back together.





Whew.  That was a lot of work just sorting through the photos...imagine the effort put into actually doing the work!

The "grand reveal" will be the next post.





The big reveal

The process of refurbishing our Pilatus PC-12 finished on schedule on March 25, 2019. That is a total of 48 calendar days or just under seve...